Sunday, May 9, 2010
Saturdays progress
I added the alternator's pivot point to the bracket and decided that I will surely need to have an idler roller involved to minimize belt squeal. So after scrounging around in my local parts store I found a roller that looks suitable. I just finished drawing up some plans for a spacer bushing that I will need to get the pulley mounted. Hopefully I can get them dropped by a machine shop this week. I'm trying to keep things kind of modular so that if a part fails I can redesign without major work. Hopefully the first design is adequate. Yea right. LOL.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment