Monday, March 28, 2011

Bellhousing finished

I wanted to show the final version of the bellhousing.  It is ready to be installed in these pictures. 

All the lines are -3AN.  The supply line goes through the original fork hole and the bleed line goes through an opening that I made.

One shot from the rear face.  The lines are braided stainless with a teflon jacket, but I put some rubber hose around them for protection where they pass through the bellhousing.


This is a closeup of the boss that I fabbed for the bleed line to pass through.  It was made from some 120" thick aluminum tubing and welded into place.

No comments:

Post a Comment